(07) 4/9/14 - Gunks Greenway D&H Canal
 gets new Long Path Bridge

LDTC builds new bridge

Gunks Greenway D&H Canal Gets New Long Path Bridge

On April 4, 2014 members of the LDTC pre-built this bridge

at the home of one of it’s members.  On April 9, 2014 the bridge was installed.

Below are pictures from April 9, the on-site installation of the bridge.

© Marty Costello-2022