LDTC builds new bridge
Gunks Greenway D&H Canal Gets New Long Path Bridge
On April 4, 2014 members of the LDTC pre-built this bridge
at the home of one of it’s members. On April 9, 2014 the bridge was installed.
Below are pictures from April 9, the on-site installation of the bridge.



































